Automotive · PPAP and change control

PPAP and ECN software without the binder

Collect every PPAP element with evidence, get it reviewed and approved internally, issue the PSW, and control engineering changes with sign-off from every affected department.

Why PPAP and change control are hard to keep under control

A Production Part Approval Process submission has up to 18 elements, from design records and PFMEA to measurement system studies, capability results and the Part Submission Warrant. In many plants each element lives in a different folder, owned by a different person, and the status is tracked in a spreadsheet that is out of date by the time it is shared.

Engineering changes create the same problem in reverse. A customer drawing change or an internal process change affects purchasing, production, quality, stores and planning, and each department has to confirm it has acted. When that confirmation is an e-mail thread, nobody can prove later who agreed to what.

The Zefron QMS Portal gives every part submission a structured PPAP record with each required element, its evidence and its review status, and gives every change an ECN with a defined review, department sign-offs and final approval. Both are linked to the controlled documents they change.

PPAP and ECN features

PPAP elements

  • All 18 elements, marked required or not applicable by submission level
  • Evidence uploaded per element
  • Mark ready, review, accept or return
  • Progress visible at a glance

Approval and PSW

  • Internal approval by the responsible head
  • Part Submission Warrant generated from the record
  • Submitted and customer decision recorded
  • Approved, interim or rejected with history

Engineering change (ECN)

  • Customer and internal changes
  • Affected parts and documents listed
  • Review steps, then sign-off per department
  • Not applicable recorded with a reason

Traceability

  • Every action with name, date and time
  • Registers exported to CSV
  • Linked to APQP deliverables
  • Ready for customer and certification audits

Spreadsheets vs enterprise QMS vs Zefron

How the three common approaches compare.

Excel and shared foldersEnterprise QMS suitesZefron QMS Portal
Set-up timeReady today, but rebuilt for every auditMonths of project work and consultantsConfigured for you; most go live in two to four weeks
ApprovalsE-mail threads, signatures on paperFixed workflows, changes need ITReview and department-head approval on every action
Version controlOld copies stay in useYesOnly the current version is visible; full history kept
Audit trailNoneYesEvery action with name, date and time
Reminders and overdue trackingManualYesAutomatic e-mail reminders and dashboards
Data entered onceCopied between filesOften separate modulesLinked across documents, 8D, audits, PPAP and quality tools
CostLow licence cost, high staff timeHigh licence and implementation costPriced for small and mid-size companies

Free downloads: 8D, CAPA, PPAP and audit checklist templates →

Where PPAP and change control are required

Customer-specific requirements usually add to these.

RequirementHow the portal supports it
IATF 16949 clause 8.3.4.4Product approval process for parts and services, normally PPAP for automotive customers.
IATF 16949 clause 8.5.6.1Control of changes, with evaluation, verification and customer approval where required.
ISO 9001 clause 8.5.6Review and control of changes to production and service provision.
ISO 9001 clause 8.3.6Design and development changes identified, reviewed and controlled.
Customer requirementsSubmission levels, element lists and warrant format follow your customer.

Live in three steps

1

Configure

We set up your sites, departments, standards, document levels, numbering and approval chains.

2

Migrate

Your existing procedures, work instructions, forms and records are moved into the portal with their current revision.

3

Train & go live

Administrators and users are trained online. Most organisations go live within two to four weeks.

Frequently asked questions

What is PPAP?

The Production Part Approval Process is the automotive method for showing a customer that a supplier understands the design and specification and that the process can consistently produce conforming parts at the quoted rate. It is submitted as a set of up to 18 elements with a Part Submission Warrant.

Which PPAP elements does the portal cover?

All 18, from design records and engineering change documents to the PSW, sample parts and customer-specific requirements. Each submission marks which elements are required for its level.

What is an ECN?

An engineering change note records a change to a product or process, who reviewed it, which departments confirmed their actions and who approved it.

Can PPAP link to APQP?

Yes. When the PPAP is submitted, the matching APQP deliverable is updated automatically, so the same information is not entered twice.

Is there a free demo?

Yes. Book a free 30-minute online demo and we will walk through a PPAP and an ECN using sample parts.

Architecting Trust. Standardizing Scale.

See it with your own documents

Free 30-minute online demo for any industry. Bring a procedure and a form; we show them inside the portal.