ISO 9001 Internal Audit Checklist: How to Plan, Run and Close an Audit
Internal audits are your chance to find problems before the certification body or a customer does. ISO 9001:2015 clause 9.2 requires them, but leaves the method to you. This checklist covers the full cycle, from the annual programme to closing findings.
1. Build the audit programme
- List every process and clause in scope, and every site.
- Set frequency by risk and past results: weak or critical processes more often, stable ones less.
- Cover the whole QMS at least once in the certification cycle; most companies do it every year.
- Assign auditors who do not audit their own work (clause 9.2.2 c).
- Publish the programme and keep it up to date when audits move.
2. Plan each audit
- Define scope, criteria (clauses, procedures, customer requirements) and date.
- Review previous findings, open CAPAs, complaints and KPIs for the area.
- Prepare questions and the records you want to sample.
- Send the plan to the auditee a few days ahead.
3. Questions by clause
| Clause | Ask or check |
|---|---|
| 4 Context | Are internal and external issues and interested parties reviewed? Is the scope current? |
| 5 Leadership | Do people know the quality policy and objectives that apply to their work? |
| 6 Planning | Are risks and opportunities identified with actions and owners? |
| 7.1.5 Monitoring | Are measuring instruments calibrated and identified, with records? |
| 7.2 Competence | Is training recorded and effectiveness checked for the roles sampled? |
| 7.5 Documented information | Is the version in use current and approved? Are obsolete copies withdrawn? |
| 8.4 Suppliers | Are suppliers evaluated and re-evaluated with records? |
| 8.5 Production | Are work instructions available at the point of use and followed? |
| 8.7 Nonconforming output | Is nonconforming product identified, segregated and dispositioned? |
| 9.1 Evaluation | Are KPIs measured and analysed, and customer satisfaction monitored? |
| 9.3 Management review | Do minutes cover all required inputs, with decisions and actions? |
| 10.2 Corrective action | Are root causes found and effectiveness verified before closure? |
4. Run the audit
- Hold a short opening meeting to confirm scope and timing.
- Follow the process: ask, observe and sample records. "Show me" beats "tell me".
- Record objective evidence: document numbers, record IDs, dates and names.
- Note good practice as well as gaps.
- Close with a meeting that summarises findings so nothing is a surprise in the report.
5. Write clear findings
Each finding should state the requirement, the evidence and the gap. For example:
Requirement: clause 7.5.3.2 d – control of changes. Evidence: work instruction WI-PRD-014 rev C in use at line 2; rev D approved on 12 September. Gap: obsolete revision not withdrawn from the point of use.
Grade findings consistently, for example major nonconformity, minor nonconformity and opportunity for improvement.
6. Close the loop
- Raise a corrective action for every nonconformity, with an owner and due date.
- Require root cause, not only correction.
- Verify effectiveness before closing, ideally at the next audit of that area.
- Report audit results and overdue actions to management review (clause 9.3).
Common internal audit findings from certification bodies
- Audit programme not covering all processes or sites.
- Auditors auditing their own area.
- Findings closed without evidence of effectiveness.
- Audit results not discussed in management review.
Keeping the programme, checklists, findings and corrective actions in one place makes each of these easy to prove.
Audit management software: Plan internal, process, supplier and customer audits, record findings and follow them to closure. See how it works →